devbox/plan.md
shoemoney 3c69a28057
Some checks are pending
CI / vet-build-test (push) Waiting to run
docs: P2 (M8a auth audit) shipped — +s attenuation + invite revocation 🛡️📊
2026-06-23 20:29:22 -05:00

8.7 KiB
Raw Blame History

🗺️ devbox — What's Next (PRD)

status base release public

📋 A short, honest backlog for what comes after the adoption push (installers + Docker + dashboard). Ordered by leverage, not by milestone number. Every item lists why it matters, its scope, and how we'll know it's done. M9–M11 stay demand-driven — captured, not committed.

🎯 Where we are

v1 is complete + audited + hardened. M8 (v2 foundations) shipped & fleet-verified: schema migration runner, per-(share,id) snapshots, daemon control socket + pause/resume, M8a teams (principals · roles · invites with attenuation · members), and restore byte-safety. Plus an embedded live dashboard, cross-platform installers with keep-alive services, a hub Docker image for NAS, and macOS Full Disk Access detection.

🚀 P1 shipped (2026-06-23): real published release (latest, 6 OS/arch incl. linux/arm64 for Pi), a one-shot scripts/release.sh, CI on Forgejo + GitHub Actions (vet · build · -race), the hub image in the Forgejo registry, and a public shoemoney/devbox-dist repo so curl|sh works with no token. The GitHub repo is now public (AGPLv3, module path github.com/shoemoney/devbox → go install works) after a clean two-scanner git-history secret sweep. Verified end-to-end on clean no-Go amd64 and arm64 boxes.

flowchart LR
    NOW["✅ adoption tooling<br/>installers · docker · dashboard"] --> P1["✅ P1<br/>Releases + CI<br/>+ public repo"]
    P1 --> P2["✅ P2<br/>M8a auth audit<br/>2 fixes + tests"]
    P2 --> P3["🔨 P3<br/>dashboard depth"]
    P3 -.demand-driven.-> LATER["🔮 M9–M11<br/>E2E · P2P · HA · TUI"]
    style NOW fill:#1e5a2e,stroke:#51cf66,color:#fff
    style P1 fill:#1e5a2e,stroke:#51cf66,color:#fff
    style P2 fill:#1e5a2e,stroke:#51cf66,color:#fff
    style P3 fill:#5a4a1e,stroke:#ffd43b,color:#fff
    style LATER fill:#0d1117,stroke:#4F9CF9,color:#fff

✅ P1 — Releases + CI (close the adoption loop) — SHIPPED 2026-06-23

Why: the curl | sh installer and Docker image were built, but the installer's primary path — download a prebuilt binary — had nothing to download (no published release), so it silently fell back to go build / local dist/. A stranger couldn't adopt devbox without Go + the repo. P1 closed that gap and gave the v2 codebase the regression safety it lacked.

Shipped

  • scripts/release.sh — one-shot: cross-build (now 6 targets incl. linux/arm64 + linux/arm for Pi) → create/update the release → upload de-versioned assets (devbox_<os>_<arch>, +.exe) the installer downloads directly, plus a de-versioned SHA256SUMS so shasum -c matches. Idempotent.
  • CI on Forgejo Actions (.forgejo/workflows/) + GitHub Actions mirror: go vet · go build ./... · go test ./... -race on push/PR; release-on-tag workflow ready. GitHub CI is green on every push (Forgejo waits on a self-hosted runner — per the gotcha, the local release.sh is the real path).
  • Hub image published to the Forgejo registry: git.shoemoney.ai/shoemoney/devbox-hub:latest; compose now image: by default (--build for local source).
  • Deviation (approved): the source repo stays private, so a public shoemoney/devbox-dist repo carries the installers + binaries as release assets → curl|sh works with no token. Separately, the GitHub mirror was made public (AGPLv3 — matching the open-core moat, module path github.com/shoemoney/devbox so go install …/cmd/devbox@latest works) after a clean two-method git-history secret scan.

Acceptance — all met ✅

  • ✅ Clean no-Go box, curl -fsSL …/install.sh | sh installs a working devbox from the real release — verified end-to-end on amd64 and on arm64 (qemu Pi-proxy; binary runs). Real Pi pending its next wake.
  • ✅ docker compose up -d pulls the published image (no local build) — verified on the NAS (throwaway stack, production hub untouched).
  • ✅ CI green on main (GitHub Actions) and gates PRs.

Effort: M · Risk: low — landed without product-code changes (module-path rename only).


🥈 P2 — Adversarial audit of the M8a auth surface

Why: M8a added real privilege code — invite attenuation (meta.MayGrant), the push write-gate, principal binding on join, token handling. It has unit + HTTP + fleet tests, but no dedicated adversarial pass. This is the M7.5 treatment for v2's new attack surface, before anyone relies on it for multi-owner shares.

✅ SHIPPED 2026-06-23 — 13-agent adversarial pass (6 finders + skeptic verify), 2 real findings fixed, rest documented as single-owner residuals. Full report: docs/M8a-audit.md.

Findings (hunted with regression tests for each real one)

  • Invite replay / reuse — ✅ defended: RedeemToken is an atomic CAS; sequential + concurrent double-redeem both fail; PoP checked before redeem.
  • Privilege escalation — 🛠️ FIXED: MayGrant never attenuated the granted +s bit (req.Reshare copied verbatim) — now MayGrant(…, grantReshare) rejects conferring +s you don't hold (owners unconstrained). Role bounding / no-demote-up / server-derived caller role were already solid.
  • TOCTOU legacy→explicit flip — ✅ defended by publishMu; the push-gate micro-race is an accepted low-risk residual.
  • Revoked-device bearer reuse — ✅ defended: revoked=0 filtered in both DeviceByBearer and EffectiveMember (denied on the next request).
  • Cross-share leakage — ✅ defended: redemption binds share/principal/role from the server-side binding, never the request.
  • Join PoP — ✅ defended; surfaced that invites were unrevocable bearer capabilities → 🛠️ FIXED: added meta.RevokeInvite + POST /v1/invite/revoke + devbox invite revoke <token>.

Acceptance — met ✅

  • ✅ Both fixes have failing-then-passing regression tests (TestInviteCannotGrantReshareCallerLacks, TestInviteRevoke, +5 TestMayGrant cases); go test ./... -race clean (18 pkgs). Live-fleet replay of the revoke flow pending the Pis' next wake; HTTP+race covers the full handler stack today.
  • ✅ docs/M8a-audit.md records findings, confirmed defenses, and the residual single-owner-threat-model deferrals.

Effort: M · Risk: medium (security-sensitive — done carefully, not rushed).


🥉 P3 — Dashboard depth (delight, not load-bearing)

Why: the live dashboard wows already, but it only animates join + push. More flow types + a terminal view would make it a genuinely complete ops surface.

Scope

  • Emit pull (head fetch / propagation), gc (sweep), and conflict flow events from the hub; animate them.
  • A historical sparkline window persisted server-side (currently the frontend computes rates from the live stream only).
  • (Optional) an M11 TUI over the daemon control socket (devbox top?) — re-adds the /events SSE stream we trimmed, now with a real consumer (bubbletea).

Acceptance

  • ✅ A gc run and a multi-device pull both visibly animate; new event types fleet-verified on the SSE stream.

Effort: S–M · Risk: low.


🔮 Deferred — demand-driven (per the v2 spec's own guard)

Do not pre-build these — there's no user who needs them yet, and the spec explicitly defers them:

Milestone Trigger to build it
M9 — E2E (convergent encryption) a real untrusted-hub user appears (you self-host on your own NAS → you trust it)
M9 — S3/R2 + Litestream HA hub durability/DR becomes a felt need beyond NAS snapshots (slots behind the blobstore.Store seam)
M9 — read-side ACL gating a genuinely untrusted multi-owner share exists
M10 — LAN P2P chunk exchange the hub uplink actually hurts (today the hub is on the LAN)
M10 — conflict sidecar + diff3 resolver conflicts get frequent enough to want interactive 3-way merge
M11 — full TUI + power sanity on demand

Recommendation: start at P1. It finishes the adoption story you just set and hardens the build — highest leverage, lowest risk. 🚀